by Rally Marketing | Aug 29, 2018
Chemical Plant Facility Scope of Work: Installation of structural stiffening beams Description: Stiffening beams needed to be installed beneath the existing deck in a production area to support new process skid without shutting-in production equipment. A PWE was...
by Rally Marketing | Aug 29, 2018
Deepwater Spar-Production Facility Scope of Work: Installation of Xylene hanger Description: A xylene hanger needed to be installed on a producing facility while the platform maintained production. A pressurized welding enclosure was installed on a suspended scaffold...
by Rally Marketing | Aug 29, 2018
Deepwater Spar – Production Facility Scope of Work: Deck Extension installation Description: The challenge was to safely install and weld a large deck (approximately 80 ft. In length) on a producing facility without shut-in to maintain production. The PWE required...