Scope of Work: Deck Extension installation
Description: The challenge was to safely install and weld a large deck (approximately 80 ft. In length) on a producing facility without shut-in to maintain production. The PWE required intricate planning on phases of installation for pre-work, setting the deck & ultimately encapsulating the deck to perform welding installation. The hot work was completed safely and successfully throughout all phases within the PWE.